Facts

The petitioner, M/s Tanor Engineering, challenged the rejection of its technical bid for a Performance-Based Maintenance Contract (PBMC) for certain sections of NH-15 and NH-515, issued by the Chief Engineer, PWD (NH Works), Assam. The bid was rejected on three grounds: insufficient Air Compressors, failure to show a committed work where the petitioner was L1, and incomplete disclosure of a large delayed contract where the petitioner was a sub-contractor. The petitioner argued that it had provided sufficient proof of having two Air Compressors, that the L1 status was not yet confirmed by a Letter of Acceptance, and that as a sub-contractor who had completed its portion of the delayed work, disclosure in Annexure-VIII was not required. The respondents are the State of Assam and its departments, along with the fifth respondent who was the successful bidder.

Held

The Court held that the second and third grounds for disqualifying the petitioner's technical bid were arbitrary and liable to be set aside. Regarding the second ground, the Court accepted the petitioner's submission that without a Letter of Acceptance (LoA) or intimation of L1 status, the work was not a committed work in the context of Clause 4.2 of the RFP. For the third ground, the Court found that Annexure-VIII pertains to the contractor or joint venture, not sub-contractors who have completed their portion of the work. The petitioner's sub-contract work was certified as completed, and a previous writ petition had recorded this completion. Therefore, the petitioner was not bound to submit details of the principal contractor's uncompleted work. The Court noted that the first ground for disqualification (Air Compressors) was not explicitly decided upon, and consequently, the matter was remanded back to the State respondents to decide if this single ground was sufficient for disqualification. The Court cited N.G. Projects Ltd. Vs. Vinod Kumar Jain and Ors. for the principle that courts should refrain from interfering with tender evaluation unless there is total arbitrariness or malafide, but in this instance, it found arbitrariness in two grounds.

Key Issues

1. Whether the petitioner adequately demonstrated possession of two Air Compressors as required by Clause 1.1(A) of Appendix to Instructions to Bidders (ITB), considering the tax invoice for '1 set' which included a tractor-mounted compressor, and if the rejection was arbitrary without seeking clarification, as argued by the petitioner, versus the respondents' view that only one compressor was documented. 2. Whether the petitioner's failure to list its L1 status for another job in the committed work format (Annexure-VI) was a valid ground for rejection, given the petitioner's argument that no Letter of Acceptance (LoA) was issued, and thus it was not a committed work in the stipulated sense, as against the respondents' reliance on Clause 4.2 of the RFP. 3. Whether the petitioner was obligated to disclose a delayed contract exceeding Rs. 300 Crore in Annexure-VIII, where the petitioner acted as a sub-contractor and had completed its portion of the work, as contended by the petitioner, versus the respondents' position that the delay in the principal contractor's work necessitated disclosure under Clause 4.1(j)(1) and Annexure-VIII of the RFP.

Sections Cited

Section-2, Clause 1.1(A), Clause 4.1(j)(1), Clause 4.2, Clause 23.4, Annexure-VI, Annexure-VIII

AI-generated summary — verify with the full judgment below

Page No.# 1/18 GAHC010079832025

2025:GAU-AS:6079

THE GAUHATI HIGH COURT (HIGH COURT OF ASSAM, NAGALAND, MIZORAM AND ARUNACHAL PRADESH) Case No. : WP(C)/2068/2025 M/S TANOR ENGINEERING AND ANR A PROPRIETORSHIP CONCERN FIRM HAVING ITS REGISTERED OFFICE AT P-SECTOR, ITANAGAR, P.O. AND P.S.- ITANAGAR, DIST- PAPUMPARE- 791111, ARUNACHAL PRADESH, REPRESENTED BY ITS PROPRIETOR MR. DILING TATAK 2: DILING TATAK S/O TAGOM TATAK R/O P-SECTOR ITANAGAR P.O. AND P.S.- ITANAGAR DIST- PAPUMPARE-791111ARUNACHAL PRADES VERSUS THE STATE OF ASSAM AND 4 ORS. REPRESENTED BY THE COMMISSIONER AND SECRETARY TO THE GOVT OF ASSAM, PUBLIC WORKS DEPARTMENT ASSAM 2:THE CHIEF ENGINEER PWD (NH WORKS) ASSAM CHANDMARI GUWAHATI ASSAM-781003 3:BID EVALUATION COMMITTEE REPRESENTED BY ITS CHAIRMAN PWD (NH WORKS) ASSAM CHANDMARI GUWAHATI-781003 4:THE MINISTRY OF ROAD TRANSPORT AND HIGHWAYS

Page No.# 2/18 REPRESENTED BY CHIEF ENGINEER PWD (NATIONAL HIGHWAYS) PUBLIC WORKS DEPARTMENT CHANDMARI GUWAHATI ASSAM-03 5:SANJAY KUMAR SINGH A PROPRIETORSHIP CONCERN PROPRIETOR- SANJAY KUMAR SINGH S/O LT. BALRAM SINGH R/O CHIRWAPATTY ROAD TINSUKIA P.O

The judgment continues below.

Read the full judgment

A free account opens 10 full GST judgments a month (one account works on both bharattax.net and this site). Re-reading one you have already opened does not count again.

See plans and prices

The summary, the parties, the sections and the citations above are open to everyone and always will be. Only the text of the order and the PDF are metered.

Reproduced from the public record of the Gauhati High Court. Verify against the court's own copy before relying on it. Income tax judgments are on bharattax.net.