M/S Kothari Associates vs. State Of Uttarakhand And Others
Held
The Court held that while Article 14 strikes against arbitrary state action, considerable latitude is allowed to the State in matters of contract awards, which involve distribution of largesse. The Court must balance conflicting interests and interfere only if a clear transgression of Article 14 is made out or the action is palpably unfair. Regarding the appellant being L-1, the Court affirmed that being the lowest tenderer does not create a legal right to demand a contract. Clause 35.1 of the Standard Bidding Documents, which the appellant accepted, clearly empowers the employer to reject any bid or annul the process without liability. The Court also clarified that while the Uttarakhand Procurement Rules, 2008, permit negotiation with the L-1 bidder under exceptional circumstances, it is not a mandatory duty. The Court found that the respondents' decision to re-tender was based on a rationale that the appellant's bid, after adding GST, exceeded the technical estimate. The Court declined to interfere, considering the principles of judicial review and the fact that the new tender's value was also within a reasonable range. Therefore, the appeal was dismissed.
Facts
M/s Kothari Associates (the appellant) participated in an e-tender floated by the State of Uttarakhand for construction of buildings. The appellant was found to be the lowest bidder (L-1) after their financial bid was opened. However, the respondents decided to cancel the tender and go for a re-tender. The appellant filed a writ petition challenging this decision, which was dismissed by the learned Single Judge. The appellant then filed this special appeal. The State, in its affidavit, explained that the initial tender was floated without clarity on GST rates, requiring bidders to submit rates excluding GST. Subsequent clarifications indicated that GST should be included in calculations. After adding 12% GST to the appellant's bid, the total amount exceeded the departmental technical estimate, leading to the decision for a re-tender. The appellant argued their bid was lower than the tender value and that the respondents acted arbitrarily.
Key Issues
1. Whether the respondents' action of cancelling the tender and issuing a fresh tender notice, despite the appellant being the lowest bidder (L-1), is arbitrary and violative of Article 14 of the Constitution of India, considering the appellant's bid was lower than the tender value? Petitioner's arguments: The appellant contended that their bid, even after adding GST, was below the tender value, and the respondents' action was arbitrary. They argued that the respondents should have negotiated with them as the L-1 bidder, citing the Uttarakhand Procurement Rules, 2008. They also pointed to the fact that the initial tender value was higher than their bid. Revenue/State's arguments: The respondents supported their action based on the affidavit filed. They explained that the initial tender was floated without clarity on GST, and bidders were asked to quote excluding GST. After adding GST, the appellant's bid exceeded the departmental technical estimate. They relied on Clause 35.1 of the Standard Bidding Documents, which grants the employer the right to reject any bid or annul the bidding process without incurring liability. They also argued that being L-1 does not confer a legal right to a contract and that negotiation with the L-1 bidder is not mandatory.
Sections Cited
Section 14, Clause 35.1, Rule 3(9)
AI-generated summary — verify with the full judgment below
Cause title — parties, addresses and appearances
JUDGMENT
Coram: Hon’ble K.M. Joseph, C.J. Hon’ble Sharad Kumar Sharma, J.
Dated: 25th July, 2018
K.M. JOSEPH, C.J. (Oral)
Appellant is the writ petitioner.
By e-tender notice dated 22.11.2017, the Superintending Engineer called for tenders in respect of construction of residential and non- residential buildings. Including the appellant, there were six contractors, who participated. Out of them, only two were found to be technically responsive, including the appellant. Accordingly, the financial bid of the appellant was opened on 23.02.2018. Appellant was found to be L-1. However, the respondents decided to go in for a re-tender after cancelling the earlier tender. This occasioned the filing of the writ petition, wherein the following reliefs were
The judgment continues below.
Read the full judgment
A free account opens 10 full GST judgments a month (one account works on both bharattax.net and this site). Re-reading one you have already opened does not count again.
The summary, the parties, the sections and the citations above are open to everyone and always will be. Only the text of the order and the PDF are metered.
Reproduced from the public record of the Uttarakhand High Court. Verify against the court's own copy before relying on it. Income tax judgments are on bharattax.net.