M/S. Vriddhi Infratech INDIA PVT. LTD. vs. The Executive Engineer

WP(C)/25732/2022HC KeralaGSTCNR KLHC01054332202213 January 2023Bench: HONOURABLE MR. JUSTICE GOPINATH P.11 pages
AI SummaryRemanded

Held

The Court found a prima facie lack of basis for the additional 3% deduction without proper determination of subsumed VAT liability. It quashed the impugned speaking order (Ext.P7) and remitted the matter to the 2nd respondent for fresh consideration after affording the petitioner a hearing.

Facts

The petitioner, a contractor, tendered for CPWD works in the pre-GST regime, completing them post-GST. A dispute arose over the calculation of GST compensation, specifically the deduction of an additional 3% from the base price after accounting for VAT on materials, which the petitioner contested as baseless.

Key Issues

Whether the Central Public Works Department's methodology for calculating GST compensation for pre-GST tendered works, by deducting an additional 3% beyond the actual VAT on materials, was legally sound, and if such deduction lacked a proper basis for determining the subsumed tax liability.

Sections Cited

Rule 10 of the Kerala Value Added Tax Rules

AI-generated summary — verify with the full judgment below

Heard together (2 matters)

WP(C) NO. 26389 OF 2022
WP(C).25732/2022

Read from the judgment's own cause title. This page is filed under one of them.

IN THE HIGH COURT OF KERALA AT ERNAKULAM PRESENT THE HONOURABLE MR. JUSTICE GOPINATH P. FRIDAY, THE 13TH DAY OF JANUARY 2023 / 23RD POUSHA, 1944 WP(C) NO. 26389 OF 2022 PETITIONER: M/S.VRIDDHI INFRATECH INDIA PVT. LTD., PLOT NO. 330/1, GROUND FLOOR, ROAD NO. 25, BANJARA HILLS, HYDERABAD – 500 034, TELANGANA REPRESENTED BY ITS VICE PRESIDENT, VENKATA RATNA PRASAD Y. RESPONDENTS: 1 THE EXECUTIVE ENGINEER, CENTRAL PUBLIC WORKS DEPARTMENT (CPWD), OFFICE OF THE EXECUTIVE ENGINEER, IISER TVM PROJECT DIVISION - I, MELETHUMELE, VATTIYOORKAVU P.O, THIRUVANANTHAPURAM – 695 013. 2 THE DIRECTOR GENERAL, CENTRAL PUBLIC WORKS DEPARTMENT (CPWD), A-WING, ROOM NO.- 101 NIRMAN BHAWAN, NEW DELHI – 110 011. 3 THE CHIEF ENGINEER, CENTRAL PUBLIC WORKS DEPARTMENT (CPWD), C.G.O. COMPLEX, POONKULAM, VELLAYANI P.O, THIRUVANANTHAPURAM – 695 522. ADV.P.R.AJITH KUMAR THIS WRIT PETITION (CIVIL) HAVING COME UP FOR ADMISSION ON 13.01.2023, ALONG WITH WP(C).25732/2022, THE COURT ON THE SAME DAY DELIVERED THE FOLLOWING:

WP(C) NOS. 26389 & 25732 OF 2022 2 IN THE HIGH COURT OF KERALA AT ERNAKULAM PRESENT THE HONOURABLE MR. JUSTICE GOPINATH P. FRIDAY, THE 13TH DAY OF JAN

The judgment continues below.

Read the full judgment

A free account opens 10 full GST judgments a month (one account works on both bharattax.net and this site). Re-reading one you have already opened does not count again.

See plans and prices

The summary, the parties, the sections and the citations above are open to everyone and always will be. Only the text of the order and the PDF are metered.

Reproduced from the public record of the Kerala High Court. Verify against the court's own copy before relying on it. Income tax judgments are on bharattax.net.