Midland Engineering And Contracting Company v. Kerala Water Authority

Court
Kerala High Court
Case number
WP(C)/13947/2022
Date of judgment
15 Sept 2023
Bench
HONOURABLE MR. JUSTICE AMIT RAWAL
Petitioner
MIDLAND ENGINEERING AND CONTRACTING COMPANY
Respondent
KERALA WATER AUTHORITY
CNR
KLHC010280122022

Judgment

IN THE HIGH COURT OF KERALA AT ERNAKULAM PRESENT THE HONOURABLE MR. JUSTICE AMIT RAWAL FRIDAY, THE 15TH DAY OF SEPTEMBER 2023 / 24TH BHADRA, 1945 WP(C) NO. 20836 OF 2022 PETITIONER:

MIDLAND ENGINEERING CONTRACTING COMPANY VARIKKODAN BUILDING, VALIYAPARAMBA, DOWN HILL.P.O., MALAPPURAM. REPRESENTED BY ITS MANAGING PARTNER, PIN – 676519 BY ADVS.

P.SHANES METHAR N.KRISHNA PRASAD RESPONDENTS:

1 KERALA WATER AUTHORITY JALABHAVAN, VELLAYAMBALAM, THIRUVANANTHAPURAM.

REPRESENTED BY ITS MANAGING DIRECTOR, PIN – 695033 2 THE CHIEF ENGINEER KERALA WATER AUTHORITY (NORTHERN REGION), O/O. CHIEF ENGINEER, MALAPARAMBA, KOZHIKODE., PIN – 673017 3 SUPERINTENDING ENGINEER O/O. SUPERINTENDING ENGINEER, KERALA WATER AUTHORITY, PH CIRCLE MALAPPURAM, MALAPPURAM., PIN – 676505 BY ADV P.M.JOHNY THIS WRIT PETITION (CIVIL) HAVING COME UP FOR ADMISSION ON 15.09.2023, ALONG WITH WP(C).13853/2022, 13873/2022 AND CONNECTED CASES, THE COURT ON THE SAME DAY DELIVERED THE FOLLOWING:

WP(C) NO. 20836 OF 2022 & con.cases -2-

IN THE HIGH COURT OF KERALA AT ERNAKULAM PRESENT THE HONOURABLE MR. JUSTICE AMIT RAWAL FRIDAY, THE 15TH DAY OF SEPTEMBER 2023 / 24TH BHADRA, 1945 WP(C) NO. 13853 OF 2022 PETITIONER:

M/S. MIDLAND ENGINEERING CONTRACTING COMPANY, VARIKKODAN BUILDING, VALIYAPARAMBA, DOWN HILL P.O., MALAPPURAM 676 519, REP. BY ITS MANAGING PARTNER.

BY ADVS.

P.SHANES METHAR N.KRISHNA PRASAD RESPONDENTS:

1 KERALA WATER AUTHORITY, JALABHAVAN, VELLAYAMBALAM, THIRUVANANTHAPURAM 695 033, REP BY ITS MANAGING DIRECTOR.

2 THE CHIEF ENGINEER, KERALA WATER AUTHORITY (NORTHERN REGION), O/O.

CHIEF ENGINEER, MALAPARAMBA, KOZHIKODE 673 017.

3 SUPERINTENDING ENGINEER, O/O. SUPERINTENDING ENGINEER, KERALA WATER AUTHORITY, P H CIRCLE MALAPPURAM, MALAPPURAM, 676 505.

BY ADV P.M.JOHNY THIS WRIT PETITION (CIVIL) HAVING COME UP FOR ADMISSION ON 15.09.2023, ALONG WITH WP(C).20836/2022 AND CONNECTED CASES, THE COURT ON THE SAME DAY DELIVERED THE FOLLOWING:

WP(C) NO. 20836 OF 2022 & con.cases -3-

IN THE HIGH COURT OF KERALA AT ERNAKULAM PRESENT THE HONOURABLE MR. JUSTICE AMIT RAWAL FRIDAY, THE 15TH DAY OF SEPTEMBER 2023 / 24TH BHADRA, 1945 WP(C) NO. 13873 OF 2022 PETITIONER:

M/S.MIDILAND ENGINEERING CONTRACTING COMPANY, VARIKKODAN BUILDING, VALIYAPARAMBA, DOWN HILL P.O., MALAPPURAM 676 519, REP. BY ITS MANAGING PARTNER.

BY ADVS.

P.SHANES MATHER N.KRISHNA PRASAD RESPONDENTS:

1 KERALA WATER AUTHORITY, JALABHAVAN, VELLAYAMBALAM, THIRUVANANTHAPURAM 695 033, REP. BY ITS MANAGING DIRECTOR.

2 THE CHIEF ENGINEER, KERALA WATER AUTHORITY (NORTHERN REGION), O/O.

CHIEF ENGINEER, MALAPARAMBA, KOZHIKODE 673 017.

3 SUPERINTENDING ENGINEER, O/O. SUPERINTENDING ENGINEER, KERALA WATER AUTHORITY, P H CIRCLE MALAPPURAM, MALAPPURAM 676 505.

BY ADV P.M.JOHNY THIS WRIT PETITION (CIVIL) HAVING COME UP FOR ADMISSION ON 15.09.2023, ALONG WITH WP(C).20836/2022 AND CONNECTED CASES, THE COURT ON THE SAME DAY DELIVERED THE FOLLOWING:

WP(C) NO. 20836 OF 2022 & con.cases -4-

IN THE HIGH COURT OF KERALA AT ERNAKULAM PRESENT THE HONOURABLE MR. JUSTICE AMIT RAWAL FRIDAY, THE 15TH DAY OF SEPTEMBER 2023 / 24TH BHADRA, 1945 WP(C) NO. 13876 OF 2022 PETITIONER:

M/S. MIDLAND ENGINEERING CONTRACTING COMPANY, VARIKKODAN BUILDING, VALIYAPARAMBA, DOWN HILL P.O, MALAPPURAM 676 519, REP. BY ITS MANAGING PARTNER.

BY ADVS.

P.SHANES METHAR N.KRISHNA PRASAD RESPONDENTS:

1 KERALA WATER AUTHORITY, JALABHAVAN, VELLAYAMBALAM, THIRUVANANTHAPURAM 695 033, REP. BY ITS MANAGING DIRECTOR.

2 THE CHIEF ENGINEER, KERALA WATER AUTHORITY (NORTHERN REGION), O/O.

CHIEF ENGINEER, MALAPARAMBA, KOZHIKODE 673 017.

3 SUPERINTENDING ENGINEER, O/O. SUPERINTENDING ENGINEER, KERALA WATER AUTHORITY, P H CIRCLE MALAPPURAM, MALAPPURAM 676 505.

BY ADV P.M.JOHNY THIS WRIT PETITION (CIVIL) HAVING COME UP FOR ADMISSION ON 15.09.2023, ALONG WITH WP(C).20836/2022 AND CONNECTED CASES, THE COURT ON THE SAME DAY DELIVERED THE FOLLOWING:

WP(C) NO. 20836 OF 2022 & con.cases -5-

IN THE HIGH COURT OF KERALA AT ERNAKULAM PRESENT THE HONOURABLE MR. JUSTICE AMIT RAWAL FRIDAY, THE 15TH DAY OF SEPTEMBER 2023 / 24TH BHADRA, 1945 WP(C) NO. 13946 OF 2022 PETITIONER:

MIDLAND ENGINEERING AND CONTRACTING COMPANY VARIKODAN BUILDING, VALIYAPARAMBA, DOWN HILL.P.O, MALAPPURAM. REPRESENTED BY ITS MANAGING PARTNER, PIN - 676519 BY ADV P.SHANES METHAR RESPONDENTS:

1 KERALA WATER AUTHORITY REPRESENTED BY ITS MANAGING DIRECTOR, JALA BHAVAN, VELLAYAMBALAM, THIRUVANANTHAPURAM., PIN - 695033 2 THE CHIEF ENGINEER KERALA WATER AUTHORITY (NORTHERN REGION), O/O.

CHIEF ENGINEER, MALAPARAMBA, KOZHIKODE., PIN - 673017 3 SUPERINTENDING ENGINEER O/O. SUPERINTENDING ENGINEER, KERALA WATER AUTHORITY, PH CIRCLE KOZHIKODE, MALAPARAMBA.P.O., KOZHIKODE., PIN - 676505 BY ADV P.M.JOHNY THIS WRIT PETITION (CIVIL) HAVING COME UP FOR ADMISSION ON 15.09.2023, ALONG WITH WP(C).20836/2022 AND CONNECTED CASES, THE COURT ON THE SAME DAY DELIVERED THE FOLLOWING:

WP(C) NO. 20836 OF 2022 & con.cases -6-

IN THE HIGH COURT OF KERALA AT ERNAKULAM PRESENT THE HONOURABLE MR. JUSTICE AMIT RAWAL FRIDAY, THE 15TH DAY OF SEPTEMBER 2023 / 24TH BHADRA, 1945 WP(C) NO. 13947 OF 2022 PETITIONER:

MIDLAND ENGINEERING AND CONTRACTING COMPANY VARIKODAN BUILDING, VALIYAPARAMBA, DOWN HILL.P.O., MALAPPURAM.

REP. BY ITS MANAGING PARTNER., PIN - 676519 BY ADVS.

P.SHANES METHAR N.KRISHNA PRASAD RESPONDENTS:

1 KERALA WATER AUTHORITY JALABHAVAN, VALLAYAMBALAM, THIRUVANANTHAPURAM.

REP. BY ITS MANAGING DIRECTOR, PIN - 695033 2 THE CHIEF ENGINEER KERALA WATER AUTHORITY(NORTHERN REGION), O/O.

CHIEF ENGINEER, MALAPARAMBA, KOZHIKODE., PIN - 673017 3 SUPERINTENDING ENGINEER O/O. THE SUPERINTENDING ENGINEER, KERALA WATER AUTHORITY, PH CIRCLE, KOZHIKODE, MALAPARAMBA.P.O., KOZHIKODE., PIN - 673009 BY ADV P.M.JOHNY THIS WRIT PETITION (CIVIL) HAVING COME UP FOR ADMISSION ON 15.09.2023, ALONG WITH WP(C).20836/2022 AND CONNECTED CASES, THE COURT ON THE SAME DAY DELIVERED THE FOLLOWING:

WP(C) NO. 20836 OF 2022 & con.cases -7-

IN THE HIGH COURT OF KERALA AT ERNAKULAM PRESENT THE HONOURABLE MR. JUSTICE AMIT RAWAL FRIDAY, THE 15TH DAY OF SEPTEMBER 2023 / 24TH BHADRA, 1945 WP(C) NO. 13952 OF 2022 PETITIONER:

MIDLAND ENGINEERING AND CONTRACTING COMPANY VARIKODAN BUILDING, VALIYAPARAMBA, DOWN HILL.P.O, MALAPPURAM/REPRESENTED BY ITS MANAGING PARTNER, PIN - 676519 BY ADVS.

P.SHANES METHAR N.KRISHNA PRASAD RESPONDENTS:

1 KERALA WATER AUTHORITY REPRESENTED BY ITS MANAGING DIRECTOR, JALA BHAVAN, VELLAYAMBALAM, THIRUVANANTHAPURAM., PIN - 695033 2 THE CHIEF ENGINEER KERALA WATER AUTHORITY (NORTHERN REGION) O/O. CHIEF ENGINEER, MALAPARAMBA, KOZHIKODE., PIN - 673017 3 SUPERINTENDING ENGINEER O/O. SUPERINTENDING ENGINEER, KERALA WATER AUTHORITY, PH CIRCLE MALAPPURAM, MALAPPURAM., PIN - 676505 BY ADV P.M.JOHNY THIS WRIT PETITION (CIVIL) HAVING COME UP FOR ADMISSION ON 15.09.2023, ALONG WITH WP(C).20836/2022 AND CONNECTED CASES, THE COURT ON THE SAME DAY DELIVERED THE FOLLOWING:

WP(C) NO. 20836 OF 2022 & con.cases -8-

IN THE HIGH COURT OF KERALA AT ERNAKULAM PRESENT THE HONOURABLE MR. JUSTICE AMIT RAWAL FRIDAY, THE 15TH DAY OF SEPTEMBER 2023 / 24TH BHADRA, 1945 WP(C) NO. 13957 OF 2022 PETITIONER:

MIDLAND ENGINEERING AND CONTRACTING COMPANY VARIKODAN BUILDING, VALIYAPARAMBA, DOWN HILL.P.O., MALAPPURAM. PIN - 676519 REPRESENTED BY ITS MANAGING DIRECTOR, BY ADVS.

P.SHANES METHAR N.KRISHNA PRASAD RESPONDENTS:

1 KERALA WATER AUTHORITY JALABHAVAN, VELLAYAMBALAM, THIRUVANANTHAPURAM.

REPRESENTED BY ITS MANAGING DIRECTOR., PIN - 695033 2 THE CHIEF ENGINEER KERALA WATER AUTHORITY (NORTHERN REGION), O/O.

CHIEF ENGINEER, MALAPARAMBA, KOZHIKODE., PIN - 673017 3 SUPERINTENDING ENGINEER O/O. SUPERINTENDING ENGINEER, KERALA WATER AUTHORITY, PH CIRCLE KOZHIKODE, KOZHIKODE., PIN - 673009 BY ADV P.M.JOHNY THIS WRIT PETITION (CIVIL) HAVING COME UP FOR ADMISSION ON 15.09.2023, ALONG WITH WP(C).20836/2022 AND CONNECTED CASES, THE COURT ON THE SAME DAY DELIVERED THE FOLLOWING:

WP(C) NO. 20836 OF 2022 & con.cases -9-

JUDGMENT This order of mine shall dispose of eight writ petitions.

2.

Challenge has been laid to the communications of the Kerala Water Authority; dated 16.2.2022 in W.P(C).13947/2022,

dated

14.3.2021

in W.P(C).13853/2022,

W.P(C).13873/2022

and W.P(C).13876/2022,

dated

16.6.2022

in W.P(C).13946/2022,

dated

14.3.2022

in W.P(C).20836/2022,

dated

16.3.2022

in W.P(C).13957/2022, to execute the agreement and start the work by reducing the tender price by relying upon Government Order dated 01.09.2016 envisaging tender excess guidelines for approval of tender by competent authorities. Aforesaid Government Order dated 01.09.2016 is challenged in W.P(C).13952/2022.

3.

Petitioner is a partnership firm and a work contractor undertaking various projects of higher stakes.

WP(C) NO. 20836 OF 2022 & con.cases -10-

Kerala Water authority in pursuance of the resolution dated 20.03.2021 and letter dated 08.11.2021 issued notices inviting tenders for augmentation of water supply scheme to various Panchayat works, to be submitted before the last date. Name of the works undertaken by the petitioner reads as follows:

“1. WP(C) No. 13853/2022 : EXHIBIT P1- DATED 14.03.2021-

(UNDER

SUPERINTENDING ENGINEER PH CIRCLE MALAPPURAM) Name of Work;- JJM CWSS TO PONNANI AND ADJOINING PANCHAYATHA PH2 - CWSS TO MARANCHERRY VELIYANCODE PERUMPADAPP PANCHAYATHS - SUPPLYING, LAYING, TESTING AND COMMISSIONING OF DISTRIBUTION SYSTEM

AND

PROVIDING

FHTCs

IN VELIYAMCODE PANCHAYATH -PACKAGE 4A & B (CANOLI CANAL CROSSING USING 500MM HDPEPIPE”.

2. WP(C) No. 13873/2022 : EXHIBIT P1: DATED 14.03.2022 (UNDER SUPERINTENDING ENGINEER PH CIRCLE MALAPPURAM) Name of Work: JJM CWSS TO PONNANI AND ADJOINING PANCHAYTHS PH 2 - CWSS TO MARANCHERY VELIYANCODE PERUMPADAPP PANCHAYATHS – SUPPLYING, LAYING, TESTING AND COMMISSIONING OF DISTRIBUTION

WP(C) NO. 20836 OF 2022 & con.cases -11-

SYSTEM

AND

PROVIDING

FHTCS

IN MARANCHERY PANCHAYATH- PACKAGE-3 3. W.P.(C) No. 13876/2022 EXHIBIT P1: DATED 14.03.2021

-

(UNDER

SUPERINTENDING ENGINEER PH CIRCLE MALAPPURAM) Name of Work: “ JJM CWSS TO PONNANI AND ADJOINING PANCHAYATHA PH2- CWSS TO MARANCHERRY VELIYANCODE PERUMPADAPP PANCHAYATHS - SUPPLYING, LAYING, TESTING AND COMMISSIONING OF DISTRIBUTION SYSTEM

AND

PROVIDING

FHTCs

IN PERUMPADAPP PANCHAYATH-PACKAGE 5 4. W.P.(C) No.13946/2022 :- EXHIBIT P5:- DATED 16.02.2022 (UNDER SUPERINTENDING ENGINEER PH CIRCLE KOZHIKODE) Name of Work: “JALJEEVAN MISSION - PHASE II - 2021-22, PROVIDING FUNCTIONAL HOUSE HOLD TAP CONNECTION BY AUGMENTATION AND EXTENSION OF EXISTING WSS IN MAVOOR GRAMA PANCHAYATH IN KOZHIKODE 5. WP(C) No. 13947/2022: EXHIBIT P1 DATED 16.02.2022-

(UNDER

SUPERINTENDING ENGINEER PH CIRCLE KOZHIKODE) Name of Work: WSS TO ULLIYERI, MOODADI AND ADJOINING PANCHAYATH IN KOZHIKODE DISTRICT : PACKAGE ILL ZONE II - PROVIDING FUNCTIONAL HOUSE HOLD TAP CONNECTIONS BY LAYING NEW DISTRIBUTION LINES AT

WP(C) NO. 20836 OF 2022 & con.cases -12-

KOOTHALI GRAMA PANCHAYATH 6. W.P.(C) No. 13952/2022 EXHIBIT P5: DATED 26.03.2022 (UNDER SUPERINTENDING ENGINEER PH CIRCLE MALAPPURAM) Name of Work: JAL JEEVAN MISSION - 21-22 CWSS TO THAZHEKKODE AND ALIPPARAMBA GRAMA PANCHAYATHS - PACKAGE-II-DESIGN AND CONSTRUCTION OF 32.00 LL, 12.00 LL, 7.00 LL CAPACITY OHSR/GLSRS RCC FOOT BRIDGE, SUPPLYING AND LAYING OF CLEAR WATER PUMPING GRAVITY MAINS, SUPPLY AND ERECTION OF RAW WATER, CLEAR WATER PUMPSETS AND TRANSFORMER AT WTP SITE, POWER CONNECTION WORK” 7. WP (C) No. 13957/2022: EXHIBIT P1. DATED 16.03.2022:

(UNDER

SUPERINTENDING ENGINEER PH CIRCLE KOZHIKODE) Name of Work:

JJM(2021-22) - ARWSS TO KRISHNAGIRI. PURAKKADY, AND AMBALAVAYAL VILLAGES PROVIDING FUNCTIONAL HOUSE HOLD TAP CONNECTION IN MEENAGADI PANCHAAYTH(7550FHTC) 8.W.P.(C)

No.

20836/2022:

(UNDER SUPERINTENDING ENGINEER PH CIRCLE MALAPPURAM) Name of Work: JJM - WSS TO CHEEKODE AND ADJOINING VILLAGES SUPPLY LAYING BALANCE DISTRIBUTION WITH FHTC IN KUZHIMANNA

WP(C) NO. 20836 OF 2022 & con.cases -13-

GRAMA

PANCHAYATH

IN

MALAPPURAM DISTRICT” 4.

The e-tender notice envisaged that the selection process would be based upon Quality and Cost Based Selection (QCBS) method for projects greater than Rupees Five Crores as per the Board Resolution 11141 dated 23.02.2021.

The detailed tender notice accompanied by the aforementioned e-notice envisaged the name of the project, work and the process of the receipt of the tenders containing technical and Financial bids. It also envisaged that the technical bids will be opened in the presence of the bidder or the authorised representative by the Superintendent Engineer and thereafter on receipt of the communication from the Superintendent Engineer of acceptance of technical bid tenderers would be informed of opening the financial bids. Condition No.7 of the detailed tender notice also re-iterated that the tender would be awarded to the bidder with the QCBS method i.e., the “Score Pattern”

WP(C) NO. 20836 OF 2022 & con.cases -14-

which was attached as annexure and shown in 7.16.1 which consists of various stages i.e., stage 1 to stage 4 – evaluation of technical bid, marks obtained in technical bid, evaluation of financial bid, conversion of financial bid amount to score, combined technical and financial score. Condition Number 7.9 also prescribed that the price bid would be submitted only in the format of Bill of Quantity (BOQ) and on variation of the price bid, as per clause 7.9.3, the tenderer was bound to carry out the work as per the specification at ‘Quoted Rate’ which was further qualified that nothing inferior to the specification as per the scope of work included as part of the Notice Inviting Tender (NIT) shall be acceptable.

5. Petitioner along with other bidders submitted the bids in pursuance to the notice inviting tenders containing detailed tender notice and the conditions and had undergone all the stages noticed above. Vide impugned communications was called upon to enter into an agreement but with a rider to reduce the amount. It

WP(C) NO. 20836 OF 2022 & con.cases -15-

is the aforementioned conditions which is under challenge in the present writ petitions on the following points:

1)Rules of the game once begun cannot be deviated at the time of awarding of the work.

2) The impugned condition in the communications was based upon the decision of the Government dated 01.09.2006 which was on the pattern of “Two Bids System”.

3) The said two bids system was done away with as per the Board Resolution 11141 in the 419th meeting held on 23.02.2021 which was made public on 20.03.2021 where authority after discussing the matter in detail, decided to implement the quality and cause based selection i.e., QCBS method of selecting the bidders mandatorily for all tenders with Tender Probable Amount of Contract (TPAC) above Rupees Five Crores in the Kerala Water Authority.

4) The aforementioned condition was further modified by communication dated 08.11.2021 whereby the existing QCBS Score sheet, Format Q3, Format Q4 were modified.

Ext.P4 was under QCBS format.

WP(C) NO. 20836 OF 2022 & con.cases -16-

6.

All petitioners are successful bidders and the course adopted by the respondent No.3 is against the law of contract. Thus, the act of respondent No.3 is beyond jurisdiction as the provisions of the notice inviting tender cannot be departed or deviated.

7.

On the other hand, learned Standing Counsel representing the respondent No.3 supported the impugned communications on various points.

1) QCBS is the only guidelines. Rate was fixed in accordance with Ext.P1. Therefore, they are not bound by the rate quoted by rank No.1. Clause 2C of the Government Letter dated 01.09.2016 dealt with admissible tender excess wherein all agencies taking up the public works were required to ensure that the tender of the lowest bidder will be accepted after following the criteria, that is either of the three conditions i.e., the Quated Rate of the lowest bidder or PWD local market rates or current Delhi schedule of rates with latest cost index plus

WP(C) NO. 20836 OF 2022 & con.cases -17-

10% tolerance limit.

2) Kerala Water Authority is bound to follow the modalities of the tender procedure prevailing in the Public Works Department, Government of Kerala for award of the contracts. Therefore, terms and conditions of the PWD Manual were made applicable to the contracts to be executed by the Kerala Water Authority.

3) The rate quoted by the petitioner contractor was more than the TPAC i.e., the Tender Probable Amount of Contract. QCBS system is only for selecting tender and not for selecting the rate of the tender.

4) QCBS and the tender conditions are only for the purpose of entitling the best tender but the rate at which the work can be awarded is based as per the Government Order.

5) Tenderer is at liberty either to accept or reject the work if the awarded amount is less than the

WP(C) NO. 20836 OF 2022 & con.cases -18-

Quoted Rate. In other words, there is no compulsion on the tenderer to accept the offer rates if less than Quoted Rates.

6) Terms and conditions of tender do not contain any condition that the work would be allotted to the highest rank at L1 rate. There is no arbitrariness on the part of the tender committee and therefore this Court should be circumspect in causing interference under Article 226 of the Constitution of India.

There is no deviation from the NIT conditions and urged this Court for dismissal of the writ petitions.

8.

I have heard learned counsel for the parties and appraised the paper books.

9.

In order to appreciate the arguments of the respective parties, it would be necessary for this Court to refer to the terms and conditions of the notice inviting tenders and resolution dated 23.02.2021:

1. E-TENDER NOTICE

WP(C) NO. 20836 OF 2022 & con.cases -19-

The Superintending Engineer. P.H Circle, Kerala Water Authority, Kozhikode invites sealed competitive electronic tenders in TWO level system for the following work from Registered Class A contractors of Kerala Water Authority or contractors Registered in other departments in Kerala State / in other states in India/ in equivalent class and manufacturers eligible for A class license from Kerala Water Authority/reputed contracting firms in India.

The tenderers shall have experience in implementing similar works. The selection process will be based on Quality and Cost Based Selection (QCBS) method for projects greater than Rs5 crores as per Board Resolution No.

11141 dated 23/02/20217.

XXXXXXX XXXXXXX KERALA WATER AUTHORITY 2.DETAILED TENDER NOTICE XXXXXX XXXXXX 7.

The selection process will be based on Quality and Cost Based Selection (QCBS) method for projects greater than Rs 5 crores as per Board Resolution No.11141 dated 23/02/2021. The tender will be awarded to the

WP(C) NO. 20836 OF 2022 & con.cases -20-

bidder with the highest score based on QCBS method. Score pattern of QCBS is attached as annexure with the bid document and sample calculation of QCBS method is shown in 7.16.1.

Bidder shall have to qualify pre-qualification criteria of this tender document for the work under reference. Bidder shall submit the required supporting documents relevant to qualification criteria, for technical evaluation of the bid.

KERALA WATER AUTHORITY 7.TENDER CONDITIONS:PART-1 XXXXXXX XXXXXXX XXXXXXX 7.9.3 VARIATION OF PRICE BID The tenderer is bound to carry out the work as per the specification at the quoted rate. Nothing inferior to specification as per the scope of work included as acceptable. Price variation on any account shall not be permitted of this NIT shall be not explicitly specified otherwise in this NIT and the tenderer is expected to follow sound engineering practices in his designs and cost calculations. Changes in statutory taxes/levies, if any, shall be applied on cost of pipe in case of pipeline works, involving pipe supply, In all such

WP(C) NO. 20836 OF 2022 & con.cases -21-

cases the duties, levies, and taxes in percentage that he has considered in the quoted amount and the cost of pipes shall be declared by the tenderer while subnjung his price bid. Any escalation/reduction in statutory duties and levies will be applied only on the basic price of pipes and specials. No escalation in statutory taxes, duties and levies etc. shall be allowed beyond the approved period as per the procurement schedule, accepted and included in the agreement.

xxxxxxxx xxxxxxxx 7.16.1 Sample calculation of Quality and Cost Based Selection (QCBS) method Scoring pattern followed depends on the type and requirement of the project.

Stage 1 : Technical Bid Evaluation Bidder details Technical mark obtained Bidder 1 90 Bidder 2 80 Bidder 3 70 Stage 2 Financial Bid Evaluation Bidder details Financial Bid Amount Bidder 1 1,50,000 Bidder 2 1,30,000

WP(C) NO. 20836 OF 2022 & con.cases -22-

Bidder 3 1,10,000 Stage 3: Conversion of Financial Bid amount to score Bidder details Financial Bid Amount Financial Score (LFB-F x 100) Bidder 1 1,50,000110000

150000

x 100=73.33 Bidder 2 1,30,00010000/130000

x 100=84.62 Bidder 3 1,10,000 100 LFB-Lowest Financial Bid, F-Quoted Amount Stage 4: Combined Technical and nancial score (CIFS) Bidder details Applying weights for Technical and Financial Score CIFS Evaluated rank of the bidder Weightage 50:50 Bidder 1 90x50/100+7 3.33 x 50/100 81.67 Rank 3 Bidder 2 80x50/100+8 4.62 x 50/100 82.31 Rank 2 Bidder 3 70x50/100+1 00 x 50/100 85 Rank 1 Weightage 60:40 Bidder 1 90x60/100+7 3.33 x 40/100 Rank 1 Bidder 2 80x60/100+8 4.62 x 40/100 Rank 3 Bidder 3 70x60/100+1 00 x 40/100 Rank 2 Weightage 70:30 Bidder 1 90x70/100+7 3.33 x 30/100 84.99 Rank 1 Bidder 2 80x70/100+8 4.62 x 30/100 81.39 Rank 2

WP(C) NO. 20836 OF 2022 & con.cases -23-

Bidder 3 70x70/100+1 00 x 30/100 79 Rank 3 “Website:http://

www.kwa.kerala.gov.in

Fax:91-0471-2324903 Tel:0471-2328654 KERALA WATER AUTHORITY Jalabhavan Thiruvananthapuram-695033 Kerala PROCEEDING OF THE MANAGING DIRECTOR Sub:- Implementation of Quality and Cost Based Selection (QCBS) method of selecting bidders in Kerala Water Authority, Tendering of Civil, Electrical and

Mechanical works together for

comprehensive water supply schemes, Modification of existing NIT clause 7.14- Orders

Issued

-

Reg _________________________________________________ No.3334/AE(TMU)/2021/KWA Dated:20.03.2021 ___________________________________________________________ Read:- Resolution No.11141 of the 419th meeting of KWA held on 23/02/2021 Kerala Water Authority is responsible to complete many high valued projects to extent

WP(C) NO. 20836 OF 2022 & con.cases -24-

piped water supply and sewerage system across the state. In order to bring about a system, in which these projects are completed in a time bound manner using modern technology, increased output benefitting more population, the recommendations for modifying the bid selection criteria and monitoring was placed before the Authority in its 419th meeting held on 23/02/2021 and the Authority resolved to approve the recommendations vide resolution number 11141.

1.Implementation of Quality and Cost Based Selection (QCBS) method of selecting bidders in Kerala Water Authority Kerala Water Authority has been following a standard bid document approved by the Board (Mother NIT) for all works and the lower limit of pre qualification tender for all works (except Water Treatment Plant and Sewage Treatment Plant) was raised to 5 crores. The tender submitted by the tenderer / firm are evaluated in two phases. Phase 1 - Technical evaluation and Pre qualification of tenderers and Phase 2- Evaluation of price bid of the prequalified tenderers. Presently, Kerala Water Authority is following L1 system under which lowest bidder is given the contract. Construction of water supply infrastructure project and sewerage

WP(C) NO. 20836 OF 2022 & con.cases -25-

projects are having both complexity and high impact and hence L1 system may not be the most appropriate method for delivering the results taking into account of the high impact of the project. In order to get complex technological solutions at the best prices for the larger benefit of public, Quality and cost-Based Selection (QCBS) as an alternative strategy for bidding has to be considered.

The Authority resolved to implement Quality and Cost Based Selection (QCBS) method of selecting bidders mandatorily for all tenders with Tender Probable Amount of Contract (TPAC) above Rs.5 crores in KWA.

2.Tendering of Civil, Electrical and Mechanical works together for comprehensive water supply schemes The Authority discussed the present tendering method of comprehensive water supply scheme in Kerala Water Authority in which Civil, Electrical and Mechanical works are tendered separately. The Authority observed that the delay in completing any one of the above works will affect the successful time bound completion and commissioning of the whole project. Hence the Authority resolved that Civil, Electrical and Mechanical works shall

WP(C) NO. 20836 OF 2022 & con.cases -26-

be tendered together to avoid delay, cost overrun, loss of production, revenue etc.

Bidders having independent experience in civil, electrical and mechanical works can associate in the form of Joint Venture (JV) to execute the work.

3. Modification of existing NIT clause 7.14 As per the existing NIT Clause 7.14 the contractor shall prepare a CPM chart along with the detailed schedule bar chart for implementation of the work and submit along with the tender. For timely completion of works proper scheduling and coordination of all tasks, keeping track of the progress of the work etc are necessary throughout the project. For effective planning, scheduling and execution of different activities simultaneously to complete the work within the stipulated time work schedule in CPM PERT, represented in GANTT Chart, AON diagram shall also be prepared by the Tendering Authority.

For the effective implementation of the projects, the Authority resolved to modify the existing NIT Clause 7.14 as follows:

Clause No.

Existing Clause Modified Clause The work shall be The work shall be

WP(C) NO. 20836 OF 2022 & con.cases -27-

7.14 completed in all respects within…..

months from the date of award of work. This period of execution is inclusive of the monsoon season.

CPM chart along with the detailed schedule

bar chart shall also be furnished with the tender.

The schedule

bar chart

shall indicate

the weightage of each element/activity with respect to the total quoted amount for the project.

completed in all respects within....months from the date of award of work. This period of execution is inclusive of the monsoon

season.

The

Contractor shall follow the work

schedule prepared by the Tendering Authority in

CPM

PERT, which will be made available to the contractor in the form of GANTT chart and AON diagram provided with

the

bid document

to complete the work within

the stipulated

time period.

The Authority also resolved in common to modify / include necessary clauses in the existing Mother NIT to implement the above said suggestions to complete all works on time.

Under these circumstances, sanction is hereby accorded for the following 1. To implement Quality and Cost Based Selection (QCBS) method of selecũng bidders

WP(C) NO. 20836 OF 2022 & con.cases -28-

mandatorily for all tenders with Tender Probable Amount of Contract (TPAC) above Rs.

5 crores in KWA.

2. Civil, Electrical and Mechanical works shall be tendered together to avoid delay, cost overrun, loss of production, revenue etc.

Bidders having independent experience in civil, electrical and mechanical works can associate in the form of Joint Venture (JV) to execute the work.

3. Modify existing NIT Clause 7.14 as follows:

Clause No.

Existing Clause Modified Clause 7.14 The work shall be completed in all respects within....

..months from the date of award of work. This period of execution is inclusive of the monsoon season.

CPM chart along with the detailed schedule

bar chart shall also be furnished with the tender. The schedule

bar chart

shall indicate

the weightage

of The work shall be completed in all respects within.....months from the date of award of work. This period of execution is inclusive of the monsoon

season.

The

Contractor shall follow the work

schedule prepared by the Tendering Authority in CPM / PERT, which will be made available to the contractor in the form of GANTT

WP(C) NO. 20836 OF 2022 & con.cases -29-

each element/activity with respect to the total quoted amount for the project.

chart and AON diagram provided with

the

bid document

to complete the work within

the stipulated

time period.

Sanction is also accorded to modify, include necessary clauses in the existing Mother NIT to implement the above said suggestions to complete all works on time. All tendering officers are hereby directed to follow the above in all future tenders.

Sd/- Venkatesapathy S. IAS Managing Director 10.

On perusal of the terms and conditions of the notice and resolution ibid it is evident that the Kerala Water Authority in unison decided for the purpose of carrying out the tender works to implement the QCBS system, i.e., 60% technical and 40% financial and for that, clause 7.16.1 reproduced above envisaged the

WP(C) NO. 20836 OF 2022 & con.cases -30-

various stages of both technical as well as financial works. By noticing the aforementioned conditions, the petitioner and other tenderers submitted the tender well before the last date along with the requisite formalities and deposit. Their technical bids as per the procedure of the condition were evaluated by the Superintendent Engineer and thereafter financial bids were opened in their presence. It was only thereafter petitioner was found to be successful by obtaining rank No.1. Till such time there was no difficulty either for the Kerala Water Authority or for the petitioner to go ahead with the project and also by executing the purported agreement containing certain conditions for completion of the work within the time line.

11.

However vide impugned communication, the contents of one of the letter dated 16.02.2022 which is extracted hereinbelow, respondents deviated from the conditions of the tender and followed the old pattern of two bids system strictly as per the letter dated

WP(C) NO. 20836 OF 2022 & con.cases -31-

01.09.2016:

“KERALA WATER AUTHORITY Office of the Superintending Engineer, P.H.

Circle, Kozhikode, Malaparamba P.O, Pin-673 009.

No SE/PHC/KKD/D6-1484/2021 Dated16.02.2022 From The Superintending Engineer To M/s.Midland Engineering and Contracting Company Varikodan Building Down Hill Malappuram Sir, Sub:- WSS To Ulliyeri, Moodadi And Adjoining Panchayath in Kozhikode District: Package III – Zone II – Providing Functional House Hold Tap Connections By Laying New Distribution Lines at Koothali Grama Panchayath – Work Order issuing - Reg- Ref:- 1 AS No GO(Rt) No.489/2021/WRD dated 18/09/2021 for Rs 4963.50 lakhs.

2

TS

Order

Number:-

TS/2021- 2022/2021/37044, dtd 08/12/2021 for Rs 3605 lakhs

WP(C) NO. 20836 OF 2022 & con.cases -32-

3. e tender No. SE/PHC/KKD/232021-22 Dtd 18/12/2021 4. Order No KWACENR/D3-39422/2021(JJM), Dated 15/02/2022 of the Chief Engineer, Northern Region, KWA, Kozhikode.

With reference to the above, you are hereby informed that your tender for the above work is accepted for an amount of Rs.

27,00,00,000/- (Rupees Twenty Seven Crores only) which is 3.18% above the tendered PAC of Rs. 26,16,78,749.97/- You are directed to attend this office on or before 02/03/2022 with required Kerala Stamp paper worth Rs.1,00,000/- (0.1% of accepted PAC, Max Rs 1,00,000) to execute agreement and to start the work after getting necessary instructions from the Executive Engineer Projects Division, Kozhikode.

1. Before executing the agreement you should provide

Performance

gruarantee

of Rs.1,35,00,000/- (Rupees One Crore Thirty Five Lakhs Only. At least fifty percent (50%) of this shall be in the form of Treasury Fixed Deposit and the balance in the form of Bank Guarantee and produce the pass book duly pledged in favour Superintending Engineer, PH Circle, Kozhikode for fulfilment of contract. It is

WP(C) NO. 20836 OF 2022 & con.cases -33-

informed that no interest shall be payable by KWA upon the security deposit or amount payable to the contractor under the contract.

The EMD furnished along with tender will be released on receipt of the Performance guarantee and written request. You are not allowed to convert the EMD submitted by you as Performance Guarantee 2 Any failure in this direction will be liable to result in the forfeiture of your offer, Permanent Earnest Money and the cancellation of the proposed contract and the contractor shall be able to pay the Authority the entire loss that may be caused to Authority by the re-tender or the rearrangement of the work or otherwise consequent on the contractor’s failure to execute the agreement or execute the work as provided for in the clause of the Notice Inviting Tender and all such loss shall be recovered from the contractor under the provision of the Revenue Recovery Act or otherwise 3 It must be understood that on no account the rates once fixed will be increased Payment will be made as per the availability of funds for the scheme.

4 The work should be completed in all respects within 12 Months from the date of work order.

WP(C) NO. 20836 OF 2022 & con.cases -34-

5. All terms and conditions of contract and special condition shall be binding on the contract.

6 The contractor shall take fer charge of the site within 10 days after executing agreement and commence the work 7. The Contractor should complete the work in all respect as per scope of work within the accepted PAC of Rs.27,00,00,000/- 8 The contractor shall engage a licensed plumber to lay service lines in FHTCs as per the judgment in WPC18399/2020 dated 08/09/2020 of the High Court of Kerala 9 Payment will be made to the contractor for the total value of the work plus applicable GST 10. 10% of Accepted PAC is to be secured by beneficiaries This can be in the form of cash, kind, labour or materials. Hence if beneficiaries contribution is in any form other than cash such items will be accounted accordingly In such case measurements will be made separately and the contractor will be entitled for payments of such measurements Yours faithfully, Dr Gireesan P Superintending Engineer

WP(C) NO. 20836 OF 2022 & con.cases -35-

Copy To 1) Chief Engineer (NR), Kerala Water Authority, Kozhikode for favour of information 2) Executive Engineer, Project Division, KWA, Kozhikode for necessary action.

The date of handing over the site to the contractor shall be reported to this office The cost for geo tagging (@Rs. 20), Statutory fees for water connection(@Rs.575/- and additional connection fee @Rs.500/- should be recorded in the measurement book.

3) RAO.” 12.

This Court while admitting the writ petitions issued the interim order making it clear that the execution of the agreement will be without prejudice to the contentions of the petitioner. It is settled law that the terms and conditions of the tender cannot be deviated in mid way; in other words, once the rule of business has started it cannot be deviated as per the choice of the authority competent to accept the tender, after undergoing the rigmarole/process of examination of both technical and financial bids. This is precisely what has been done giving a cause to the petitioner to

WP(C) NO. 20836 OF 2022 & con.cases -36-

approach this Court, which in my view is a prima facie act of not only arbitrariness but contumacious. The whole purpose of awarding the work is to provide water supply to various Panchayats or the public living in the particular area. But it has been seen that the litigation at the hand of the State Government sometimes becomes inevitable when certain stringent conditions which are unknown to the rules of contract are unnecessarily implored. It cannot be countenanced that such conditions can go unnoticed from the scrutiny of the Court while exercising the power of judicial review under Article 226 of the Constitution of India.

13. I am of the view that the impugned communication directing the petitioner to reduce the Quoted Rate strictly not as per the terms and conditions of the tender by applying the contents of Government Order dated 01.09.2016 is not only incorrigible but fallacious and contumacious. Accordingly, the said condition in the impugned orders is hereby quashed.

WP(C) NO. 20836 OF 2022 & con.cases -37-

Writ petitions are allowed. Writ in the nature of mandamus is issued to the respondents to issue fresh work orders to the petitioner at their Quoted Rate and enter into supplemental agreements accordingly, within a period of two months, so that the petitioner contractor is able to carry out the contract within the time line and further direction is issued that in case certain works were executed, respondents shall pay to petitioners based on the agreements/supplemental agreements within one month.

Sd/- AMIT RAWAL JUDGE vv

WP(C) NO. 20836 OF 2022 & con.cases -38-

APPENDIX OF WP(C) 13853/2022 PETITIONER EXHIBITS EXHIBIT P1 TRUE COPY OF THE SELECTION NOTICE NO.

SE/PHC/MPM/DBI/JJM/45430 (A & B), /2021 DATED 14.03.2021.

EXHIBIT P2 TRUE COPY OF THE TENDER NOTICE NO.SE/PHC/MPM/47/2021-22 OF THE 3RD RESPONDENT.

EXHIBIT P3 TRUE COPY OF PROCEEDINGS O. 3334/AE (TMU) /2021/KWA DATED 20.03.2021 OF THE MANAGING DIRECTOR KWA.

EXHIBIT P4 TRUE COPY OF PROCEEDINGS NO.

3334/AE(TMU)/2021/KWA

DATED 08.11.2021.

EXHIBIT P5 TRUE COPY OF THE G.O.(P) NO.

133/2016/FIN DATED 01.09.2016.

WP(C) NO. 20836 OF 2022 & con.cases -39-

APPENDIX OF WP(C) 13873/2022 PETITIONER EXHIBITS EXHIBIT P1 TRUE COPY OF THE SELECTION NOTICE NO SE/PHC/MPM/DBI/44026/2021

DATED 14.03.2021.

EXHIBIT P2 TRUE COPY OF THE TENDER NOTICE NO.

SE/PHC/MPM/43/2021-22 OF THE 3RD RESPONDENT.

EXHIBIT P3 TRUE COPY OF PROCEEDINGS NO. 3334/AE (TMU)/2021/KWA DATED 20.03.2021 OF THE MANAGING DIRECTOR KWA.

EXHIBIT P4 TRUE COPY OF PROCEEDINGS NO.

3334/AE/(TMU)/2021/KWA

DATED 08.11.2021.

EXHIBIT P5 TRUE COPY OF THE G.O.(P) NO.

133/2016/FIN DATED 01.09.2016.

WP(C) NO. 20836 OF 2022 & con.cases -40-

APPENDIX OF WP(C) 13876/2022 PETITIONER EXHIBITS EXHIBIT P1 TRUE COPY OF THE SELECTION NOTICE NO.

SE/PHC/MPM/DBI/JJM/373/2021

DATED 14.03.2021.

EXHIBIT P2 TRUE COPY OF THE RELEVANT PORTION OF THE

TENDER

NOTICE

NO.

SE/PHC/MPM/46/2021-22 OF THE 3RD RESPONDENT.

EXHIBIT P3 TRUE COPY OF PROCEEDINGS NO.

3334/AE(TMU)/2021/KWA DATED 20.03.2021 OF THE MANAGING DIRECTOR KWA.

EXHIBIT P4 TRUE COPY OF PROCEEDINGS NO.

3334/AE(TMU)/2021/KWA

DATED 08.11.2021.

EXHIBIT P5 TRUE COPY OF THE G.O.(P) NO.

133/2016/FIN DATED 01.09.2016.

WP(C) NO. 20836 OF 2022 & con.cases -41-

APPENDIX OF WP(C) 13946/2022 PETITIONER EXHIBITS EXHIBIT P1 TRUE COPY OF THE G.O.(P) 133/2016/FIN DATED 01.09.2016 EXHIBIT P2 TRUE COPY OF THE PROCEEDINGS DATED 20.03.2021 OF THE MD KWA EXHIBIT P3 TRUE COPY OF THE COMMUNICATION DATED 08.11.2021 EXHIBIT P4 TRUE COPY OF THE TENDER NO.

SE/PHC/KKD/20/2021-22 OF THE 3RD RESPONDENT EXHIBIT P5 TRUE COPY OF THE SELECTION NOTICE NO.

SE/PHC/KKD/D3-1481/2021

DATED 16.02.2022

WP(C) NO. 20836 OF 2022 & con.cases -42-

APPENDIX OF WP(C) 13947/2022 PETITIONER EXHIBITS EXHIBIT P1 TRUE COPY OF THE SELECTION NOTICE NO.

SE/PHC/KKD/D6-1484/2021

DATED 16.02.2022. (RELEVANT PAGES) EXHIBIT P2 TRUE COPY OF THE RELEVANT PAGES OF TENDER NOTICE NO. SE/PHC/KKD/23/2021- 22 OF THE 3RD RESPONDENT EXHIBIT P3 TRUE COPY OF THE PROCEEDINGS NO.

3334/AE(TMU)/2021/KWA DATED 20.03.2021 OF MD, KWA EXHIBIT P4 TRUE COPY OD THE PROCEEDINGS NO.3334/AE(TMU)/2021/KWA

DATED 08.11.2021 EXHIBIT P5 TRUE COPY OF THE G.O.(P) NO.

133/2016/FIN DATED 01.09.2016

WP(C) NO. 20836 OF 2022 & con.cases -43-

APPENDIX OF WP(C) 13952/2022 PETITIONER EXHIBITS EXHIBIT P1 TRUE COPY OF THE G.O.(P) DATED 133/2016/FIN DATED 01.09.2016 EXHIBIT P2 TRUE COPY OF THE PROCEEDINGS OF THE MD, KWA DATED 20.03.2021 EXHIBIT P3 TRUE COPY OF THE COMMUNICATION DATED 08.11.2021

CIRCULATED

TO

CHIEF ENGINEERS EXHIBIT P4 TRUE COPY OF THE TENDER NO.

SE/PHC/MPM/36/2021-22 PUBLISHED BY THE 3RD RESPONDENT (RELEVANT PAGES) EXHIBIT P5 TRUE COPY OF THE SELECTION NOTICE NO.SE/PHC/MPM/DB4/39245/2021

DATED 26.03.2022 OF THE 3RD RESPONDENT (RELEVANT PAGES)

WP(C) NO. 20836 OF 2022 & con.cases -44-

APPENDIX OF WP(C) 13957/2022 PETITIONER EXHIBITS EXHIBIT P1 TRUE COPY OF THE SELECTION NOTICE NO.1236/D5/2021/PHC-KKD

DATED 16.03.2022 EXHIBIT P2 TRUE COPY OF THE E-TENDER NOTICE NO.SE/PHC/KKD/31/2021-22 OF THE 3RD RESPONDENT EXHIBIT P3 TRUE COPY OF THE PROCEEDINGS NO.3334/AE(TMU)/2021/KWA

DATED 20.03.2021 OF THE MANAGING DIRECTOR, KERALA WATER AUTHORITY EXHIBIT P4 TRUE

COPY

OF

THE

LETTER NO.3334/AE(TMU)/2021/KWA

DATED 08.11.2021 EXHIBIT P5 TRUE COPY OF THE G.O.(P) NO.

133/2016/FIN DATED 01.09.2016

WP(C) NO. 20836 OF 2022 & con.cases -45-

APPENDIX OF WP(C) 20836/2022 PETITIONER EXHIBITS EXHIBIT P1 TRUE COPY OF THE REVISED WORK ORDER NO.SE/PHC/MPM/DB4/38679/2021

DATED 15.02.2022 EXHIBIT P2 TRUE COPY OF THE E-TENDER NOTICE (EXHIBITS P1 AND P2 ARE REPLACED AND SUBSTITUTED

VIDE

ORDER

DATED 15.09.2023 IN I.A.NO.1 OF 2023) EXHIBIT P3 TRUE COPY OF THE PROCEEDINGS NO.

3334/AE

(TMU)/2021/KWA

DATED 20.03.2021 OF THE MD , KWA EXHIBIT P4 TRUE COPY OF THE PROCEEDINGS NO.

3334/AE(TMU)/2021/KWA DATED 08.11.2021 EXHIBIT P5 TRUE COPY OF THE G.O.(P) NO.

133/2016/FIN DATED 01.09.2016

Original PDF on the eCourts judgment service →

Reproduced from the public record of the Kerala High Court. Verify against the court's own copy before relying on it. Income tax judgments are on bharattax.net.